The following is a recap of the work that has been done during
the past six years and does not include stabilization and exterior work completed
prior to 1991.
WORK COMPLETED IN 1991-1992
New boiler, heating, ventilation with future air conditioning
capability; structural repairs to tower; new foundation at tower; attic
insulation; new underground electrical service; new electrical conduit for
courtroom lighting; exterior lighting of porch. Cost
$228,670
Funded by:
Michigan Equity Grant
$ 67,000 |
Lapeer County Bank $30,000 |
Lapeer County $100,000 |
| Detroit Edison Grant $1,500 |
Private contributions** $30,170 |
Total
$228,670 |
WORK COMPLETED IN 1993-1994
Cleaning and selective demolitioning lower lever; reconstruct
jury box; rough frame duct enclosure lower level; strip paint and wall finishes
in two offices of main level. Cost $7,000
Funded by:
| Private Donations $6,000 |
General Motors Labor |
Total $7,000 |
WORK COMPLETED IN 1995-1996
Public restrooms (handicap accessible); ramp to lower level;
new water/sewer service; fire suppression main line; partial fire suppression
system. Cost $134,384
Funded by:
Architectural Firm*
$2,700 |
Executive Director*
$2,880 |
City Tap In
$2,000 |
Lapeer Co Historical Society
$50,000 |
Lapeer DDA
$15,000 |
Lapeer County
$20,000 |
Contractor
$4,404 |
Private Contributions**
$17,400 |
Michigan Equity Grant
$20,000 |
|
|
Total $134,384 |
*in-kind services
**Most of the money included in private
contributions has been the result of the Annual Gala held at the Courthouse
by Lapeer West H. S. students to benefit the restoration project.
LOOKING AHEAD TO COMPLETION
| Perimeter footing drain |
$38,400 |
| Lower level remodeling |
51,300 |
| Air conditioning/humidification |
50,000* |
| New interior stair - fire safe enclosure from courtroom
to lower level and new exit to the barrier free ramp |
66,300 |
| New elevator - access to all levels |
86,600 |
| Fire suppression system |
37,000 |
| Lighting and electrical |
68,000 |
| Restore main level - includes restoration of main corridor
and tower stair, refurbishing rooms |
67,000 |
| Restore upper level - restoration of courtroom includes
re-creation of window shutters, new ceiling, refinishing wood floor and benches,
painting and recreation of jury box, and restoration of wood finishes |
184,300 |
| Exterior restoration - restoration of 1900 ca. north porch
stairs, restoration of north porch, reconstruction of south stairs, historic
restoration of courthouse square, land scaping and walk pavers |
52,700 |
| Other costs - architectural fees for design, construction
documents, bidding and contract adminisstration; permits, bonds; construction
contingency reserve |
154,400 |
| Total projection of probable cost |
$856,000 |
*The Lapeer County Historical Society has
pledged $28,000. Air conditioning and humidification will be critical for
the museum.